Connected OAT sensor to GSU25. Fabricated and installed bracket for GMU 22.
Time: 4 hours.
Connected OAT sensor to GSU25. Fabricated and installed bracket for GMU 22.
Time: 4 hours.
Installed DSub 1 for GNX.
Time: 4 hours.
Installed DSub 2 for GNX.

Time: 4 hours.
Installed 50 pin DSub for GEA.
Time: 4 hours.
Installed 9 pin DSub for GEA.
Time: 4 hours.
Installed 50-pin D-Sub for GAD27.
Time: 4 hours.
Installed small dsub for GAD29.
Time: 4 hours.
Installed switches and circuit breakers in the Instrument Panel. Mounted the IP to the cockpit framework.


Time: 4 hours.
Installed #6 wires to Main Bus and Ground Bus.
Time: 4 hours.
Designed the Instrument Panel and made the cutouts.





Time: 12 hours.