Here’s a video of the first flight of N17LW.
Author: Leonard Westermeyer
Right Flap Repair, Step Polish
Polished steps, repaired dent on right flap.
Time: 3 hours.
Carpet Mount, Touchup Paint on Steps
Installed carpet with Velcro. Did touchup painting of steps.
Time: 3 hours.
Wingtip Repaint
Painted wingtips.
Time: 4 hours.
Mask for Wingtip Repaint
Masked entire airplane to paint the masked portion of the wingtips.
Time: 4 hours.
Wingtip Repaint Preparation
Changed hole covers on wheels from 5/8” to 3/4”. Prepared leading edge of wing tips for repainting.
Time: 4 hours.
Nose Wheel Valve Access
Found and modified valve stem extension to work on nose wheel through nose wheel pant.
Time: 4 hours.
W & B Programming and Tire Valve Access
Drilled wheel pants for tire valve access. Programmed Weight and Balance in airplane.
W & B Measurement
Measured wheel position for Weight and Balance.
Time: 4 hours.
Calibrated Fuel Tank Senders
Calibrated fuel tanks, tapped right sender to free it. Added keep alive to MFD.
Time: 4 hours.