Installed cowling hinges and lower support plates. Finished firewall riveting.













Time: 4 hours.
Installed cowling hinges and lower support plates. Finished firewall riveting.













Time: 4 hours.
Installed nutplates on firewall for crankcase vent and oil pressure line, mounted sensor manifold.
Time: 4 hours.
Inventoried Firewall Forward, removed engine mount.
Time: 4 hours.
Engine arrived.







Time: 3 hours.
Mounted the Battery Box for the PC-680 Battery to the Firewall. Mounted the Master and Starter Solenoids to the Firewall.

Time: 4 hours.
Built the battery box to house the PC-680 Battery.

Time: 6 hours.
Installed engine mount.


Time: 4 hours.