Fit filter retainer strips to baffle floor and to #2 cylinder baffle.
Time: 4 hours.
Fit filter retainer strips to baffle floor and to #2 cylinder baffle.
Time: 4 hours.
Drilled and fitted nutplates to filter support brackets. Installed filter support brackets in snorkel with pop rivets.

Time: 4 hours.
Trimmed and fit filter support brackets and filter retaining brackets to front left baffle floor.

Time: 4 hours.
Trimmed snorkel, made snorkel brackets.
Time: 4 hours.
Mounted snorkel on servo.


Time: 4 hours.
Riveted #1 and # 2 Baffle Assemblies and Installed #3 and #4.

Time: 4 hours.
Riveted #3 Baffle Assembly. Started assembling #1 Baffle Assembly.
Time: 4 hours.
Deburred #3 and #4 Baffle assemblies.
Time: 4 hours.
Installed louvers: match drilled, drilled and cut slots, bent and primed louvers, machine countersunk cowling, riveted louvers.
Added 4 layer fiberglass cloth layup with peel-ply for cowl louvers.
Time: 4 hours.