Torqued propeller mounting nuts. Mounted spinner bulkheads.

Time: 4 hours.
Torqued propeller mounting nuts. Mounted spinner bulkheads.

Time: 4 hours.
Mounted propeller, Installed input and output of oil cooler, oil temperature sensor.





Time: 4 hours.
Removed plug from crankshaft. Cleaned and dried intake atrium.
Time: 4 hours.
Installed seals on air inlet.
Time: 4 hours.
Fabricated and fit and epoxied balsa walls for inboard intake ramps. Trimmed S-602-1 rear spinner bulkhead to match S-602B doubler ring.



Time: 4 hours.
Fabricated and fit baffle seal for rear and side baffles.
Time: 4 hours.
Finish trimmed the baffles to 3/8” from inner surface of upper cowling.


Time: 4 hours.
Rough trimmed the baffles to fit upper cowling.
Time: 4 hours.
Trimmed front baffles to front ramp baffles. Created angles to join them.

Time: 4 hours.
Fit and trimmed right baffle ramp to cylinder baffle #1.
Time: 4 hours.