Bonded oak stiffeners to gear legs and wrapped them with fiberglass tape and saturated with resin.


Time: 4 hours.
Bonded oak stiffeners to gear legs and wrapped them with fiberglass tape and saturated with resin.


Time: 4 hours.
Manufactured oak stiffeners.
Time: 4 hours.
Installed hinge in right fairing.

Time: 3 hours.
Trimmed gear leg fairings and installed hinge in left fairing.
Time: 4 hours.
Installed left wheel pant.
Time: 3 hours.
Installed right wheel pant.
Time: 4 hours.
Fit main wheel pants parts together, nut plates and screws.

Time: 5 hours.
Fitted front gear leg with hinge.
Time: 6 hours.
Drilled and located front gear fairing with magnets.
Time: 3 hours.
Fabricated and installed brake lines to wheels.
Time: 3 hours.