Installed elevators, rudder, pushrod, repaired primer rear fuselage interior.
Time: 4 hours.
Installed elevators, rudder, pushrod, repaired primer rear fuselage interior.
Time: 4 hours.
After preparation the turquoise paint stripes were applied to the fuselage.


Time: 6 hours.
After preparation the dark blue paint was applied to the empennage, fuselage, wings, cowl and wheel pants.
Time: 8 hours.
I marked the border between white and blue paint by marking the vertical position every 10 inches on the fuselage, every 4 inches on the wings and empennage and every 2 inches on the wheel pants. These marks were connected using a stiff wire to create a smooth curve with an erasable marking pen. This line was then used to locate the 1/2” flexible vinyl masking tape.

Time: 6 hours.
Continued preparing, priming and painting white paint on the fuselage, cowling, wheel fairings and pants. Had to cut and polish most of the paint because of defects in the spraying setup. Also had to repaint several surfaces because cutting was too aggressive. Conservative estimate of total time used between September and December 2021.
Time: 80 hours.
Installed heater valve.
Time: 4 hours.
Installed rudder cables in snap-in bushings.

Time: 4 hours.
Installed the Gear Leg Intersection Fairings purchased from RV-Bits in South Africa.


Time: 4 hours.
Added optional Avionics Access Plates to Front Top Skin.




Time: 4 hours.
Final trim of wheel fairing mounting plate buildup. Dimpled bottom center skin wing mounting holes. Added bottom countersunk platenuts to wing.




Time: 4 hours.