Skip to content

Leonard's RV-7A Build

A chronicle of the building of a Vans RV-7A by Leonard Westermeyer

  • Home
  • Blog
  • About
  • Contact
  • Twitter
  • Facebook
  • Google+
  • GitHub
  • WordPress.com
Leonard's RV-7A Build

Category: 4 – Fuselage

Right Flap Repair, Step Polish

Polished steps, repaired dent on right flap.

Time: 3 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on March 24, 2022Categories 3 - Wings, 4 - Fuselage, 8 - PaintLeave a comment on Right Flap Repair, Step Polish

Carpet Mount, Touchup Paint on Steps

Installed carpet with Velcro. Did touchup painting of steps.

Time: 3 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on March 23, 2022Categories 4 - Fuselage, 8 - PaintLeave a comment on Carpet Mount, Touchup Paint on Steps

Wingtip Repaint Preparation

Changed hole covers on wheels from 5/8” to 3/4”. Prepared leading edge of wing tips for repainting.

Time: 4 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on March 18, 2022Categories 4 - Fuselage, 8 - PaintLeave a comment on Wingtip Repaint Preparation

Nose Wheel Valve Access

Found and modified valve stem extension to work on nose wheel through nose wheel pant.

Time: 4 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on March 17, 2022Categories 4 - FuselageLeave a comment on Nose Wheel Valve Access

W & B Programming and Tire Valve Access

Drilled wheel pants for tire valve access. Programmed Weight and Balance in airplane.

Unknown's avatarAuthor Leonard WestermeyerPosted on March 16, 2022Categories 4 - Fuselage, 7 - Avionics & WiringLeave a comment on W & B Programming and Tire Valve Access

Moved Aircraft to Airport

Hired a wrecker truck to move the airplane to my hangar at Felts Field.

Time: 4 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on February 28, 2022Categories 2 - Empennage, 3 - Wings, 4 - Fuselage, 5 - Canopy, 6 - Engine & Firewall Forward, 7 - Avionics & Wiring, 8 - PaintLeave a comment on Moved Aircraft to Airport

Aileron Pushrod Boots

Designed, fabricated and installed aileron pushrod boots to prevent drafts into the cabin.

Time: 6 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on February 13, 2022March 27, 2022Categories 4 - FuselageLeave a comment on Aileron Pushrod Boots

Control Stick Boots

Designed and fabricated Control Stick Boots and installed them with Velcro to the cabin floor.

Time: 8 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on February 11, 2022Categories 4 - Fuselage, 7 - Avionics & WiringLeave a comment on Control Stick Boots

Final Fuselage Assembly

Installed rest of fuselage, canopy, corrected paint in front top and spinner.

Time: 3 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on January 30, 2022Categories 4 - Fuselage, 8 - PaintLeave a comment on Final Fuselage Assembly

Interior Assembly

Installed interior of cockpit, rugs, floor, baggage wall.

Time: 4 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on January 29, 2022March 27, 2022Categories 4 - FuselageLeave a comment on Interior Assembly

Posts pagination

Page 1 Page 2 … Page 13 Next page
  • Home
  • Blog
  • About
  • Contact
  • Twitter
  • Facebook
  • Google+
  • GitHub
  • WordPress.com
Leonard's RV-7A Build Blog at WordPress.com.
Leonard's RV-7A Build
Blog at WordPress.com.
  • Subscribe Subscribed
    • Leonard's RV-7A Build
    • Already have a WordPress.com account? Log in now.
    • Leonard's RV-7A Build
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...