Skip to content

Leonard's RV-7A Build

A chronicle of the building of a Vans RV-7A by Leonard Westermeyer

  • Home
  • Blog
  • About
  • Contact
  • Twitter
  • Facebook
  • Google+
  • GitHub
  • WordPress.com
Leonard's RV-7A Build

Category: 3 – Wings

Right Flap Repair, Step Polish

Polished steps, repaired dent on right flap.

Time: 3 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on March 24, 2022Categories 3 - Wings, 4 - Fuselage, 8 - PaintLeave a comment on Right Flap Repair, Step Polish

Wingtip Repaint

Painted wingtips.

Time: 4 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on March 21, 2022Categories 3 - Wings, 8 - PaintLeave a comment on Wingtip Repaint

Mask for Wingtip Repaint

Masked entire airplane to paint the masked portion of the wingtips.

Time: 4 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on March 20, 2022March 27, 2022Categories 3 - Wings, 8 - PaintLeave a comment on Mask for Wingtip Repaint

Wiring Errors, Wing Walks

Fixed wiring error copilot control stick, installed wing walks, tested GPS, aileron trim causing error message.

Time: 4 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on March 9, 2022Categories 3 - Wings, 7 - Avionics & WiringLeave a comment on Wiring Errors, Wing Walks

Wing Roots, Radio Test, Engine Crank

Finished wing root fairings, tested radio with call to Felts Tower (loud and clear), cranked engine (177 rpm).

Time: 4 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on March 7, 2022Categories 3 - Wings, 6 - Engine & Firewall Forward, 7 - Avionics & WiringLeave a comment on Wing Roots, Radio Test, Engine Crank

Wing Connections

Connected ailerons, installed aileron boots, started wing root fairings.

Time: 4 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on March 6, 2022Categories 3 - WingsLeave a comment on Wing Connections

Wings Installed

Put on the wings.

Time: 4 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on March 4, 2022March 27, 2022Categories 3 - WingsLeave a comment on Wings Installed

Moved Aircraft to Airport

Hired a wrecker truck to move the airplane to my hangar at Felts Field.

Time: 4 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on February 28, 2022Categories 2 - Empennage, 3 - Wings, 4 - Fuselage, 5 - Canopy, 6 - Engine & Firewall Forward, 7 - Avionics & Wiring, 8 - PaintLeave a comment on Moved Aircraft to Airport

Paint Blue and Turquoise

After masking and preparation was complete the blue and turquoise paint was applied to the wings, empennage, cowl and wheel pants.

Time: 6 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on January 23, 2022March 27, 2022Categories 2 - Empennage, 3 - Wings, 8 - PaintLeave a comment on Paint Blue and Turquoise

Masking for Blue and Turquoise Paint

Masking was done for the blue areas and for the turquoise stripes on the empennage, cowl, wings and wheel pants.

Time: 8 hours.

Unknown's avatarAuthor Leonard WestermeyerPosted on January 21, 2022Categories 2 - Empennage, 3 - Wings, 8 - PaintLeave a comment on Masking for Blue and Turquoise Paint

Posts pagination

Page 1 Page 2 … Page 4 Next page
  • Home
  • Blog
  • About
  • Contact
  • Twitter
  • Facebook
  • Google+
  • GitHub
  • WordPress.com
Leonard's RV-7A Build Blog at WordPress.com.
Leonard's RV-7A Build
Blog at WordPress.com.
  • Subscribe Subscribed
    • Leonard's RV-7A Build
    • Already have a WordPress.com account? Log in now.
    • Leonard's RV-7A Build
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...