Installed wires on Fuel, oil and Manifold Pressure sensors.
Time: 3 hours.
Installed wires on Fuel, oil and Manifold Pressure sensors.
Time: 3 hours.
Routed sensor wiring and installed DB connector. Installed GEA24 box and installed 3 of 4 connectors.
Time: 4 hours.
Installed hangars on exhaust, added horizontal ties.
Time: 5 hours.
Installed sensor cables on CHT and EGT sensors.


Time: 4 hours.
Finished fabrication of sensor cables for CHT and EGT.
Time: 4 hours.
Moved air intake to front ramp. Installed scat tubes to heat muff, intake air port and heater valve.
Time: 3 hours.
Started fabrication of sensor cables. Installed CHT and EGT sensors.
Time: 4 hours.
Mounted Fuel Flow Cube between fuel servo and spider.
Time: 4 hours.
Painted alternate air door. Installed supports for spark plug wires.
Time: 4 hours.
Installed alternate air door on snorkel.
Time: 4 hours.