Installed reflective covering on interior of lower cowling. Installed air vent flexible ducts.
Time: 4 hours.
Installed reflective covering on interior of lower cowling. Installed air vent flexible ducts.
Time: 4 hours.
Installed all of the Avionics Units and tested installation. All working!


Connected OAT sensor to GSU25. Fabricated and installed bracket for GMU 22.
Time: 4 hours.
Installed bracket for ELT with rivnuts. Installed GSU25 on bracket.
Time: 4 hours.
Installed OAT Sensor. Installed ELT Remote Switch.
Time: 3 hours.
Installed angles on sub-panel to support GNX375 rack. Riveted support angles to Instrument Panel for racks.
Time: 5 hours.
Cut sub-panel to permit racks from GNX375 and GTR200 to pass through.
Fabricated reduction faceplate for GMC507.
Time: 4 hours.
Fabricated mounting angles for GNX375 and GTR200 install racks.
Time: 6 hours.
Secured wiring for sensors and wired PMAG and Slick Magneto.
Time: 4 hours.