Installed #6 wires to Main Bus and Ground Bus.
Time: 4 hours.
Installed #6 wires to Main Bus and Ground Bus.
Time: 4 hours.
Designed the Instrument Panel and made the cutouts.





Time: 12 hours.
Installed Tosten Control Stick Grips for Pilot and Co-Pilot. Both are connected via molex connectors in the control stick.




Install GSA-P Wiring Harness.
Time: 4 hours.
Install GSU Wiring Harness.

Time: 4 hours.
Installed GMU Wiring Harness.
Time: 4 hours.
I designed and built a heated pitot tube and angle of attack probe.




Time: 10 hours.
Installed rudder cables in snap-in bushings.

Time: 4 hours.
Mounted the Battery Box for the PC-680 Battery to the Firewall. Mounted the Master and Starter Solenoids to the Firewall.

Time: 4 hours.
Built the battery box to house the PC-680 Battery.

Time: 6 hours.