Installed governor and control cable.
Time: 4 hours.
Installed governor and control cable.
Time: 4 hours.
Installed Spinner base with temporary spacers for cowling clearance.



Time: 4 hours.
Wired starter and routed alternator wiring.
Time: 4 hours.
Installed alternator.




Time: 4 hours.
Installed Fuel Injection Servo. Installed Throttle and Mixture Cable linkages.



Time: 4 hours.
Installed Controls to IP bracket, made new bracket because of drilling hole too large. Installed cushion clamps on sub-bulkhead bracket.


Time: 4 hours.
Installed engine on engine mount.
Time: 4 hours.
Installed and torqued engine mount.
Time: 4 hours.
Installed cowling hinges and lower support plates. Finished firewall riveting.













Time: 4 hours.
Installed nutplates on firewall for crankcase vent and oil pressure line, mounted sensor manifold.
Time: 4 hours.