Installed nut plates on lower cowl to fuselage connecting plates.
Time: 4 hours.
Installed nut plates on lower cowl to fuselage connecting plates.
Time: 4 hours.
Installed nut plates to join lower and upper cowls.
Time: 4 hours.
Filled front junction of cowl sections to match spinner.
Install hinges to lower cowling which connect it to upper cowling.
Time: 4 hours.
Install hinges to lower cowling which connect it to upper cowling.
Time: 4 hours.
Fit sides of lower cowling to fuselage and drill cowl to side hinges.


Time: 4 hours.
Fit lower cowling to upper cowling at Nose. Fit bottom of lower cowling to fuselage.



Time: 4 hours.
Installed longer hose with 0.50 restriction for MP.
Time: 4 hours.
Drilled hinges to upper cowling. Adjusted heater cable. Cut hole for oil dipstick access door.



Time: 4 hours.
Installed heater cable.

Time: 4 hours.