I removed the baggage bulkheads and installed the nut plates on F-706. I notched F-652 and installed the F-6114 B & C Cable Wear Blocks.


I temporarily installed the baggage bulkheads on F-706. As some of the screws were difficult to install along the bottom, I ran a 8/32 tap through the nut plates.

Time: 3 hours.