As I am building an RV-7A, I removed the F-772 lower skin and used the template shown on DWG 34A to locate the holes for the landing gear sockets and brake lines, and enlarged these holes as shown. Some of the forward flange of the F-704 had to also be removed for gear leg socket clearance.



Time: 4 hours.