Assembling the Center Fuselage

After all the preparation, it was time to rivet and bolt the skeleton of center fuselage together as shown on DWG 25.

D178001B-5970-4279-94E0-3852E6FCBCE96E090426-0A89-4B20-8E1D-6D4988B7C01D

I drew a centerline on the bottom flange of the F-715 ribs. Starting at the aft face of the F-704 bulkhead I installed the F-716-L&R ribs using bolts and rivets as shown on DWG 22.

Time: 6 hours.

Leave a comment