Aft Fuselage Assembly – 5

I continued by riveting the F-779 and F-778 bottom skins to the bulkheads and J-channel. I then riveted the F-773 skins to the bulkheads up to the upper J-channel, and to the J-channel itself, but no higher. The top of the skins have to be able to bend away from the upper sections of the bulkheads so the main longerons could be inserted later.

Time: 4 hours

Leave a comment