Assembling the F-705 Bulkhead – 2

I drilled and riveted the F-705J Angle, the F-705K Plate and the F-705-L seat adjustment supports to the F-705F Channel.

I then drilled the snap bushing holes and installed the nutplates on F-705D.

Then I clecoed the F-705A, D and F bulkhead components together.  Before riveting the F-705 bulkhead assembly together, I studied the NOTES on DWG 20 to know which of the various holes needed to be left open so that other pieces could be attached later.  I covered these holes with tape.  I also noted the holes that needed to have flush rivets installed and machine countersunk them.  Then I riveted the F-705 bulkhead together.

 

Time: 4 hours

Leave a comment