I began work on the fuselage by preparing the bulkheads. The first bulkhead I worked on was the firewall.
I began work on the firewall by fabricating the F-601J angles from the 2″ x 2 1/2″ stock.

Time: 2.5 hours
I began work on the fuselage by preparing the bulkheads. The first bulkhead I worked on was the firewall.
I began work on the firewall by fabricating the F-601J angles from the 2″ x 2 1/2″ stock.

Time: 2.5 hours